The Need

A mayor healthcare products manufacturer wanted to optimise their product by simplifying the production and assembly process of a nebuliser.

The Project

BlueThink carried out a detailed engineering design to bring the system from a 3 part construction to a 2 components assembly, while maintaining strict requirements of performance.

This work required the combination of complex computational fluid dynamics, material selection and characterisation, as well as production processes experience.

The Benefit

The resulting system offered not only an important reduction in the cost, but also made the design more user-friendly and reliable.

For more information and further Case Studies get in touch here